色色综合网66,一级a卡片在线观看,成人免费a视频,中文无码电影,国产AV一区二区三区

  • Hebei Xiangyuan Machinery manufacturing Co.,LTD!

Hot key words:Brake drum   Hub   Brake pads

news information

CONTACT:

Manager Lv:0086-13831914368
Manager Li:0086-15131910018
Post Code:055350
Tel:0086-319-6505298
Fax:0086-319-6505298
E-mail:lyxyqp@aliyun.com

ADDRESS:

Company Add:Workshop 6, Xingye Road, Economic Development Zone, Longyao County,Xingtai City,Hebei Province

News

Current Location:Index >> News >> News

TIME:2022.04.15

A complete hub-shaped cavity is obtained by iron mold sand coating process, and the next sand core is used to directly cast the hub parts. The cast castings eliminate the defects of shrinkage porosity and shrinkage cavity in the hub, and the cast hub has stable quality and compact internal structure, which effectively improves the appearance and internal quality of the castings and reduces the rejection rate of the castings. Compared with clay sand casting, the weight of the cast castings is reduced by 10%, which greatly improves the production efficiency and saves a lot of time, manpower, equipment and other costs.
The invention relates to a casting method of a heavy truck hub, which is characterized in that the casting method adopts an iron mold sand coating process for casting, and specifically comprises the following steps:
(1) Design a set of models with the same shape as the hub of a heavy truck as the master model;
(2) Design and manufacture a set of core box consistent with the hub cavity of heavy truck;
(3) making an iron mold shape associated with the master mold, wherein the gap between the iron mold shape and the master mold is 5-7 mm;
(4) fixing the core box in step (2) on a core making machine, heating to 170-200 DEG C, closing the mold, clamping the sand shooting plate in place, and shooting sand.

(5) fixing the master mold on a sand shooting machine, heating to 230-270 DEG C, closing the shape of the iron mold, clamping the sand shooting plate in place, then shooting sand and curing for 25 seconds;
(6) shooting the coated sand onto the pre-designed iron mold shape through the sand hole of the sand shooting machine, so that the coated sand fills the cavity between the mold and the iron mold shape, and after 30 seconds, forming the mold, and naturally cooling for 25-30 seconds, the upper and lower iron mold shape cavities coated with sand are obtained in turn, and the sand cores are lowered to the corresponding positions, so that the box can be closed and poured;
(7) raw materials mainly made of pig iron and scrap steel are mixed and then put into a smelting furnace for heating, and the temperature of molten iron is 1530 DEG C;
(8) spheroidizing the molten iron by using a flushing method;
(9) After the box is closed, clamped and fixed, the treated molten iron is poured, the pouring time is 8 minutes, and the pouring temperature is controlled at 1330-1430 DEG C, so that the required nodular cast iron hub blank parts are obtained, and the castings are taken out of the box after heat preservation for 12 minutes.

七七色导航| 91成人三级片| 日韩黄色成人| 日日干日日操日日射| 超碰亚洲AV| 欧美贱淫AAAA一级片| 免费在线播放黄色A片| 国产精品69xx| 午夜成人A∨| 狼友三级,COM| 免费无码婬片AAA| 99riav2| 日韩无码性爱| 免费看操91| 日韩A片强奸视频| 成人久久电影| 超碰91电影| 香蕉视频婷婷五月天| www.av操逼| 黄色毛片网| 八月丁香亚洲| 一区二区三区精品| 日本免费簧片| 天天澡超碰| 日韩欧美黄色| 大香蕉黄色网| 日本一区不卡免费| 91免费网战| 无码a片观看| 99玖玖资源网| 黄色A级片| 国内特级毛片| avapp在线| 91色色无码| 99超级色| 婷婷七月天激情丁香| 三级片A片| 91人人区| 日韩成人在线A片| 日韩A片在线观看视频| 欧美1级A片|